The short answer
A development feasibility sets the project’s expected end value, called the gross realisation value (GRV), against its total development cost (TDC). The gap between them is the margin. A lender reads it to size the loan, measuring the loan against the cost (loan to cost) and against the end value (LVR on GRV), and it may look at presales, the contingency and the holding costs, then test the figures with its own valuation. Run backwards, the same sum gives the residual land value: what the site is worth to a developer. This is general information, not advice.
What is a development feasibility?
A feasibility is the project’s numbers on one page. It starts with what the finished project should sell for, takes away everything it will cost to get there, and shows what’s left. A lender doesn’t take it on trust: it checks the end value against its own valuation, and the costs against the evidence behind them.
To try the numbers with your own figures, use our property development feasibility calculator.
Gross realisation value (GRV)
GRV is the total expected sale value of the finished project: for a block of units, the expected price of every unit added together.
- It needs evidence. The NSW Land and Environment Court says an estimate of the value of a development on completion should be supported by comparable sales.
- The lender uses its own valuation. In a 2016 article on apartment developments, the RBA said a lender will typically use an estimated valuation of the property to work out how much it will lend.
- Gross or net. GRV is a gross figure. Some lenders measure their limit against a net end value instead, after selling costs, so ask which one a lender’s ratio is based on.
- It can change during the build. NSW Government warns off-the-plan buyers that the finished property may be worth less than they paid by the time it’s finished. The same applies to your end value.
Total development cost (TDC)
TDC is everything it costs to get from buying the site to selling the last unit. When the NSW Land and Environment Court describes how development sites are valued, the costs it lists include the building costs and associated development costs, interest during the holding period, stamp duty, council rates, land tax, legal and advertising costs, and the selling agent’s commission. A feasibility can group them like this:
- The land: the price, stamp duty and legal costs.
- Approvals and contributions: application fees and any contributions. NSW Planning says the housing and productivity contribution applies to new residential, commercial and industrial development in Greater Sydney, the Illawarra Shoalhaven, the Lower Hunter and Greater Newcastle, and the Central Coast.
- The build: the building contract and associated development costs.
- Finance: interest and lender fees for as long as the loan runs.
- Holding: council rates and land tax while you own the site.
- Selling: marketing, legal costs and agent’s commission.
- Contingency: an allowance for costs that come in higher than budgeted.
Contingency
A contingency is money set aside in the budget for costs you can’t pin down yet. NSW Fair Trading’s building contract guidance shows why it’s needed: prime cost items “cannot be costed exactly before the work begins”, and “most variations or additions to a contract have an impact on the contract price”.
If the build costs more than planned, the difference generally comes from you, not the lender, as with a construction loan. A contingency that’s too thin shows up when a lender reads the feasibility. How big a contingency a lender wants to see is up to each lender.
Development margin
The margin is what’s left when TDC is taken from GRV, usually shown as a percentage. It can be worked out two ways:
- Margin on cost: the profit divided by TDC.
- Margin on revenue: the profit divided by GRV.
The same project gives two different percentages, so check which one a feasibility, a lender or a partner is quoting. The margin is also the project’s buffer: it’s what absorbs a lower end value or higher costs before the loan is at risk. What margin a lender wants to see is up to each lender, and this guide doesn’t say what a project needs.
Loan to cost vs LVR on GRV
A development loan can be measured two ways:
- Loan to cost (LTC): the loan as a percentage of TDC. APRA’s capital rules for banks use this kind of test: total debt against qualifying development costs.
- LVR on GRV: the loan as a percentage of the expected end value. Lenders’ public pages show limits set against the project’s end value.
A lender may test the loan against both. If it does, whichever allows the smaller loan sets the limit. How LVR works for an ordinary home loan is in what is LVR.
Say a project’s end value is 1.2 times its total development cost. A loan equal to half the cost is then about 42% of the end value. It’s the same loan, read two ways.
A made-up example to show how the two ratios work. It isn’t a typical project, margin or lending limit, or a quote.
Presales, as a lender reads them
Presales are contracts with buyers signed before the project is finished, usually off the plan.
- No set minimum from APRA. In February 2025 APRA said it hadn’t set minimum requirements or expectations for presales in its credit risk standards, and that presales still have an important role in sound credit risk management.
- Bank capital rules. APRA’s capital standard lets a bank apply a lower risk weight to a residential development loan when conditions are met, including total debt of less than 75% of qualifying development costs and, where the exposure for a single development is over $5 million, qualifying presales at least equal to the total debt. Each bank must have its own policy defining qualifying presales and qualifying development costs.
- Non-bank lenders. In March 2026 the RBA reported that the most notable easing in non-bank lending standards was for property developers, including less stringent presales requirements. Some lenders say they assess presales against the strength of the project and the developer’s capability.
- A presale isn’t cash yet. NSW Government says an off-the-plan buyer settles once the building is finished and the plan is registered, and needs to secure finance at that time. Buyers who don’t settle leave residual stock.
Putting a feasibility in front of a lender? We can talk through how lenders generally read the numbers and what they’ll want to see.
Time, holding costs and land banking
Every month a project takes adds interest, rates and land tax to TDC, and the margin shrinks. Approvals are often where time runs out: Moneysmart says planning approval can take many years and lots of money.
Holding undeveloped land in the hope it gets rezoned or approved is sometimes called land banking. Moneysmart describes it as an investment where returns depend on the land rising in value, being rezoned or getting development approval. It warns that some promoters mislead investors about rezoning prospects, that an operator can become insolvent, and that option holders can lose all the money they put in. It says to get your own legal or financial advice before you invest.
Residual land value
Residual land value is the feasibility run backwards. Instead of asking what’s left for the developer at a given land price, it asks what the land is worth once the finished value is known and every cost, including a profit and risk allowance, is taken away.
The NSW Land and Environment Court describes a version of this, which it calls the hypothetical development method, for valuing development sites. It values the completed development, then deducts the building costs and associated development costs, including the developer’s profit and risk margin, holding interest, stamp duty, council rates, land tax, legal and advertising costs, and the agent’s commission. The Court says the completed value should be supported by comparable sales, and each cost estimate by evidence.
If a vendor’s asking price is above the residual land value your numbers give, the gap is the difference between the two numbers. The feasibility calculator lets you try your own figures.
How a lender reads your feasibility
- The end value, tested against its own valuation.
- The costs, tested against the evidence behind them, including the building contract and the contingency.
- The loan, against cost and against end value.
- Presales, where the lender asks for them.
- The developer. Some lenders say they look at the project’s strength and the developer’s capability.
A feasibility shows the lender what you expect. The lender decides how much it will lend, and on what terms.
How we can help
You read our Credit Guide and give your privacy consent before we ask about your finances. We then go through the project and its numbers, and talk through how lenders generally read a feasibility and what they’ll want to see. We don’t say whether a project stacks up or what it will make: that’s your call, with your accountant and other advisers. If it’s something we can take forward, we may be able to arrange it through a lender on our panel that offers development loans, or, with your consent, refer you to a commercial finance specialist we have a referral arrangement with. Either way, we tell you who the finance would go through, and how everyone involved is paid, including any referral fee we receive, before you go ahead.
For commercial loans, lenders pay us a commission if you go ahead with a loan. Depending on the loan, we may also charge a fee. We’ll tell you whether a fee applies, how much and when it’s payable, in writing before we start. Lender fees and charges may also apply.
If your loan is regulated by the National Credit Code, any fee is set out in a Credit Quote before we start.
This guide is general information only. It was prepared without taking into account your objectives, financial situation or needs, and it isn’t tax, legal or financial product advice. Before acting on it, consider whether it’s appropriate for your circumstances and seek professional advice where appropriate. Lending criteria apply, and approval is up to the lender.
Sources: Land and Environment Court of NSW, Compensation (updated 16 June 2026); APRA, APS 112 Capital Adequacy: Standardised Approach to Credit Risk (commenced 1 July 2025), Attachment A, and APRA clarifies its March 2017 letter regarding commercial property lending (13 February 2025); Reserve Bank of Australia, Financial Stability Review, March 2026 and The Growth of Apartment Construction in Australia (Bulletin, June 2016); NSW Government, Buying property off the plan and Contracts (updated 29 April 2026); NSW Planning, Housing and productivity contribution (updated 24 November 2026); Moneysmart, Land banking (last updated 2 September 2026). All read 27 November 2026. Correct as at 27 November 2026. Rules and lender policies can change.
General information only. It doesn’t consider your objectives, financial situation or needs, and it isn’t tax, legal or financial product advice. Lending criteria, fees and charges apply.

