Knock-Down Rebuild in NSW: How It Works and How It’s Financed

A knock-down rebuild lets you keep the block you know and build a new home on it. In NSW that takes approval for the new home and the demolition, a licensed builder, and usually a construction loan that pays the builder in stages.

The short answer

A knock-down rebuild means demolishing your existing home and building a new one on the same block. In NSW you need approval for the new home and for the demolition, either as complying development from your council or an accredited certifier, or through a development application to your council. You then need a licensed builder and, if you’re borrowing, a construction loan that pays the builder in stages. Lenders often value the new home from the plans. There’s no set cost, so the guide lists what to budget for. You’ll need somewhere else to live until it’s finished. This is general information, not advice.

Not ready to talk? Get the First Home Buyers guide by email →

Planning a knock-down rebuild?

We compare how lenders on our panel handle construction loans for a rebuild, including how they value the plans and how your current loan fits, before you sign a building contract.

Start Online

or Book a Call →

For home loans, you don’t pay us a fee. Lenders pay us a commission if you go ahead with a loan. Lender fees may apply.

The rules below are NSW’s. Other states have their own planning and building rules. Your council and your builder can tell you what applies to your block.

How a knock-down rebuild works, step by step

  1. Check the block. The NSW Planning Portal suggests checking for heritage listings, tree preservation orders, underground services such as sewerage, electricity, gas and water, and drainage or stormwater issues. A builder may ask for a Section 10.7 planning certificate, which sets out the zoning, planning controls and constraints such as flooding or bushfire-prone land.
  2. Line up the finance. Know what you can borrow before you pick a design, and have the loan in place, or the contract subject to finance, before you sign.
  3. Choose a builder. The Planning Portal recommends a builder that specialises in knock-down rebuilds. Your builder may also arrange site surveys and soil checks, and may suggest a demolition contractor.
  4. Get approval for the new home. Complying development or a development application (below).
  5. Get approval to demolish, then demolish. Services are disconnected first, and the site is cleared.
  6. Build. The lender pays the builder as each stage is finished.
  7. Move in. The Planning Portal says an occupation certificate must be obtained before a new building is occupied and used.

Approval for the new home: complying development or a DA

Complying development. NSW Planning describes complying development as a combined planning and construction approval for straightforward development, decided through a fast-track assessment by a council or an accredited certifier. It covers building a new house and demolishing a building. Your plans must meet the standards in the state policy for complying development (the Codes SEPP). NSW Planning says fast-tracked complying development approvals can be issued in as little as 20 days, compared with an average of 70 days to decide a development application. Allow for yours taking longer.

Development application (DA). If your plans don’t meet every complying development standard, or your block has constraints, you lodge a development application with the consent authority, usually your local council. NSW Planning says it usually needs a statement of environmental effects.

Which route fits depends on your block and your design, so ask your council or certifier early. Lenders need the approval too: ANZ says you’ll generally need to give it council approved plans or a building permit within 6 months of loan approval.

Demolition: what NSW requires

  • Approval for the new home comes first. The Planning Portal says you can’t demolish your existing house until approval for your new home has been granted, and the demolition approval is a separate application.
  • Two routes again. Your demolition contractor may lodge a development application to demolish, or NSW Planning says you can usually demolish a house under a complying development certificate. There are limits in heritage conservation areas.
  • Asbestos. NSW Planning says a complying development certificate can only be approved for a building constructed before 1987 if asbestos can be safely removed, by a licensed contractor where required. The Planning Portal says to get an asbestos clearance certificate.
  • Services and safety. Utilities must be disconnected by licensed professionals before demolition, temporary fencing goes up, and neighbours are told before work starts.
  • A council bond. The Planning Portal says you may need to pay your council a security deposit for any damage to council property during demolition.
  • Who pays for surprises. The Planning Portal suggests asking your builder up front what you may have to pay if hazards are found on the site.

Building the new home

  • A licensed builder. Check your builder’s contractor licence on Service NSW before you sign. If you can’t find it, contact NSW Fair Trading.
  • A written contract. NSW Government says work worth more than $20,000 needs a large job contract, which must include a cooling-off period of five clear business days after you’re given a copy.
  • Home building compensation cover. For jobs over $20,000, NSW Government says your builder must have this cover. Don’t pay the deposit until you’ve seen the certificate and checked it’s valid.
  • The deposit. NSW Government says the deposit on a building contract must not exceed 10% of the contract price.
  • A fixed price. ANZ and NAB both name a fixed price building contract with a progress payment schedule for their construction loans.

Planning to knock down and rebuild? Let’s line up the finance before you sign the building contract.

Book My Home Buying Chat

How a knock-down rebuild is financed

If you’re borrowing for the build, it’s usually through a construction loan. The lender pays your builder in stages as the work is done, and you pay interest only on what’s been drawn. Once the final payment is made, it becomes a standard home loan.

  • Lenders allow it on their own terms. ANZ says its construction loan can be used for a knock-down and rebuild if a fully licensed builder does the work under a fixed price building contract. CommBank says its construction loan may suit knocking down an existing property and rebuilding.
  • The valuation is on the plans. With the house coming down, the lender looks at what will be there. ANZ arranges a ‘Tentative on Completion’ valuation based on the proposed new home. NAB values the land and the planned build together before building starts, then again at the first and final progress claims.
  • Your land can count. NAB says land you already own may count towards your share of the project cost, and how much it helps depends on what the land is worth and what you still owe on it.
  • Your current loan. If you still owe money on the home, ask the lender how that loan and the construction loan will fit together, and whether the demolition is included in the building contract it’s lending against.
  • Time limits. Lenders set deadlines to start and finish the build. Our construction loan guide sets out CommBank’s and ANZ’s.

What to budget for

There’s no standard cost for a knock-down rebuild, so we don’t quote one. The total depends on your block, the demolition and the home you build. Besides the building contract, allow for:

  • approvals, and any reports your council or certifier asks for
  • site surveys and soil checks, which the Planning Portal says may or may not be in your contract
  • demolition, if it isn’t part of the building contract, plus removing any asbestos or contaminated material
  • disconnecting services and any council security bond
  • somewhere to live during the build
  • items often outside the contract, such as landscaping, fencing and window coverings, and a buffer for variations

Your builder’s quote and contract set the real numbers. Check what each one includes before you compare them.

Where you live during the build

Once the house comes down, you’ll need somewhere else to live until the new one is finished, such as a rental or with family. During the build you may be paying rent and loan repayments at the same time, so plan for both. Delays from weather, trades or approvals add to that time.

Land tax can matter too. Revenue NSW says you may be able to claim a land tax concession for up to 4 years if you move out of your main residence and the land can’t be lived on, for example during renovation. Its page doesn’t mention demolition, so confirm with Revenue NSW or your accountant that a rebuild qualifies before you move out. If you’re selling another property to fund the build, a bridging loan is one way some people cover the gap.

How a broker helps

Your council or certifier handles approvals, your builder handles the build, and your solicitor or conveyancer reviews the contracts. A broker can compare how lenders on our panel handle construction loans for a knock-down rebuild: how each one values the plans, how your current loan and the land fit in, the contract it needs, how payments are released and the time limits. Whether a loan suits you depends on your situation, so we start by asking about it. For home loans, you don’t pay us a fee. Lenders pay us a commission if you go ahead with a loan. Lender fees may apply.

Sources: NSW Planning Portal, Knockdown and rebuild considerations and Post-consent certificates; NSW Department of Planning, Complying development (updated 26 June 2026), Demolition of buildings (updated 23 March 2026) and Local development; NSW Government, Building contracts; Service NSW, Check a builder or tradesperson licence; Revenue NSW, Principal place of residence (last updated 15 June 2026); lenders’ own pages, for what each lender says about its loan: ANZ, What you need to know about construction loans; CommBank, Construction loan (last updated 9 November 2026); NAB, How do construction or owner builder loans work?; all read 21 November 2026. Correct as at 21 November 2026. Rules and lender policies can change.

Daniel Innes
Daniel Innes

Mortgage broker at My Finance Consultants. Daniel compares home loan options from a panel of 40+ lenders for refinancers, investors and home buyers, by phone, at a time you pick online. About Daniel

General information only. It doesn’t consider your objectives, financial situation or needs, and it isn’t tax, legal or financial product advice. Lending criteria, fees and charges apply.

Questions

Common questions, straight answers.

Do I need council approval to knock down and rebuild in NSW?

Yes, for both the new home and the demolition. NSW Planning says both can be approved as complying development by a council or an accredited certifier when they meet the state standards. If they don’t, you lodge a development application, usually with your council. The NSW Planning Portal says you can’t demolish your existing house until approval for your new home has been granted.

Can I use a construction loan for a knock-down rebuild?

Some lenders allow it. ANZ says a construction loan may be used for a knock-down and rebuild if the work is done by a fully licensed builder under a fixed price building contract. CommBank says its construction loan may suit knocking down an existing property and rebuilding. Each lender sets its own conditions, so check them before you sign the building contract.

How do lenders value a knock-down rebuild?

Often on the plans. ANZ arranges a ‘Tentative on Completion’ valuation, based on the proposed new home. NAB values the land and the planned build together before building starts, then again at the first and final progress claims. The valuation helps set how much a lender will lend, so a lower result can mean putting in more of your own money.

How much does a knock-down rebuild cost?

There’s no set figure. Besides the build itself, the NSW Planning Portal lists costs to ask about: site surveys and soil checks, removing hazards such as asbestos, disconnecting services, and a possible security bond to your council for demolition. Add approval fees, somewhere to live during the build, and a buffer for variations. Your builder’s quote and contract set the real numbers.

Where do I live during a knock-down rebuild?

Somewhere else, such as a rental or with family, until the new home is finished, so budget for that alongside your loan repayments. Revenue NSW says you may be able to claim a land tax concession for up to 4 years if you move out of your main residence and the land can’t be lived on, for example during renovation. Its page doesn’t mention demolition, so confirm with Revenue NSW or your accountant that a rebuild qualifies before you move out.

Talk it through with a broker.

No obligation. No pressure. Just honest answers.

For home loans, you don’t pay us a fee. Lenders pay us a commission if you go ahead with a loan. Lender fees may apply.

Rated 5.0 from 21 Google reviews

Read the reviews →
Start Online
“Daniel was awesome. Easy to work with, very helpful and professional. Highly recommend!!”
Benjamin P. · Google
“Great service and really listens and puts the customer first”
James P. · Google
“Professional and quick. Thank you look forward to working with you again”
Kaella F. · Google
Start Online Call