Estimate the interest on a construction loan stage by stage. Enter your contract price, your progress payment stages and your own interest rate to see the interest charged while you build, and the repayment once the home is finished.

Daniel Innes, your broker
Rated 5.0 from 21 Google reviewsUse the figures in your building contract and the rate on the loan you’re looking at. The results fill in as you type.
Enter your rate, contract price, build length and stages to see the interest stage by stage.
| Stage | Paid by the loan | Month paid | Monthly interest after it’s paid | Interest from this stage to completion |
|---|---|---|---|---|
| Deposit | – | – | – | – |
| Base or slab | – | – | – | – |
| Frame | – | – | – | – |
| Lock-up | – | – | – | – |
| Fixing | – | – | – | – |
| Practical completion | – | – | – | – |
Results are estimates only, based on the figures you enter. They aren’t a quote, a loan offer or an approval, and they don’t consider your objectives, financial situation or needs. The lender decides what it will lend, how it pays each stage and the interest it charges. Compare loans on the comparison rate, not the interest rate alone. Rates change and lending criteria apply.
How it works
A construction loan pays your builder in stages, called progress payments, as each part of the work is finished. Lenders generally charge interest only on the amount drawn so far, not the full loan. So the interest is small after the deposit and grows with each stage. If a third of the loan has been paid to the builder, you pay interest on that third.
During the build, repayments are often interest-only. When the final payment is made, the loan generally switches to principal and interest on the full amount, unless a longer interest-only period was agreed, and the full loan term starts. That’s when repayments step up. This calculator shows both sides of that step, at the rate you enter.
How a construction loan works from approval to the final payment, including what lenders need and the time limits they set, is in Construction Loans Explained. Buying the block and the build together? See house and land packages. To talk through the finance for your build, see construction loans.
This calculator is general information only. It works out figures from the details you enter; it doesn’t tell you which loan, lender or repayment type is right for you.
Sources: NSW Government, Contracts for residential building work (last updated 29 April 2026); Consumer Affairs Victoria, Paying for building work (last updated 2 July 2025, read 27 November 2026); QBCC, Deposits and progress payments (last reviewed 27 June 2025); Moneysmart, Interest-only home loans (last updated 29 October 2026) and Choosing a home loan (last updated 16 September 2026).
Questions
Lenders generally charge interest only on the amount drawn so far, not the full loan. As each stage is paid to the builder, the balance grows, and so does the interest. If the loan also pays for the land, that part is usually drawn when the land settles, ahead of the build, so you pay interest on it for the whole build. Enter your stages in the calculator above to see the interest stage by stage.
Often, yes. Lenders commonly offer interest-only repayments during construction, on the amount drawn so far. Moneysmart says interest-only loans may be useful for short-term loans, such as bridging finance or a construction loan. Check what your lender offers.
After the final progress payment, the loan generally switches to principal and interest on the full amount, unless a longer interest-only period was agreed, and the full loan term starts. Moneysmart says repayments go up after an interest-only period. The calculator shows the principal and interest repayment once the home is finished, next to the interest-only repayment near the end of the build.
Your building contract sets it. In NSW, contracts above the threshold set by NSW law must have a progress payment schedule, progress payments must match the work carried out, and the deposit can’t be more than 10%. In Queensland, the QBCC says the number and timing of progress payments is negotiated, and the maximum deposit on contracts over $20,000 is 5%. Consumer Affairs Victoria sets out a standard schedule for Victoria: a 5% deposit, then 10% at base, 15% at frame, 35% at lock-up and 25% at fixing, with the rest at completion. Use the figures in your own contract.
Yes. Enter the amount you’re borrowing for the land. The calculator treats it as drawn when the build starts and charges interest on it for the whole build. If you buy the land first, as with most house and land packages, the land usually settles ahead of the build, so you may also pay interest on it in the weeks or months until the first stage. The calculator doesn’t count that time.
Rates differ by lender, loan and borrower, and they change, so the calculator uses only the rate you enter. Compare loans on the comparison rate, which Moneysmart describes as a single figure that combines the interest rate and most fees. The results are estimates, not a quote or a loan approval. The lender decides what it will lend and the rate it charges.
For home loans, you don’t pay us a fee. Lenders pay us a commission if you go ahead with a loan. Lender fees may apply, and we go through them with you before you decide.
No obligation. No pressure. Just honest answers.
For home loans, you don’t pay us a fee. Lenders pay us a commission if you go ahead with a loan. Lender fees may apply.