The short answer
We haven’t found an official average price for a bathroom, kitchen, granny flat or pool renovation, so we don’t quote one. What drives the cost is how much changes, the finishes you pick, what’s found once work starts, the approvals, and the licensed trades the job needs. The way to a real number is written quotes on the same plans, compared item by item. In NSW, work over $5,000 needs a written contract, and work over $20,000 needs a larger contract and home building compensation cover. For the ways people pay for the work, see our guide to how to finance a renovation. This is general information, not advice.
Planning a renovation?
We can look at how much equity you may be able to use and compare ways to structure the borrowing across our panel, once you have quotes.
Start OnlineFor home loans, you don’t pay us a fee. Lenders pay us a commission if you go ahead with a loan. Lender fees may apply.
The approval, licence and contract rules below are NSW’s, correct as at 27 November 2026. Other states have their own.
Why we don’t quote prices
Two bathrooms the same size can cost very different amounts, depending on what’s behind the walls, what moves and what goes in. We haven’t found an official average price for these jobs, and trade websites’ price ranges are a starting point at most. Your quotes are the only numbers that count for your home.
What drives the cost of any renovation
- How much changes. Replacing what’s there is one job. Moving walls, plumbing or drainage is a bigger one, and can change the approval you need.
- Finishes and fittings. NSW Government says items that can’t be priced until work starts are listed in the contract as prime cost items, with an allowance for their expected cost. The ACT Government’s examples include stoves, tiles, taps and bathroom fittings, and it says you pay the difference if you choose a dearer item.
- What’s found once work starts. Work that can’t be priced exactly until it starts may be listed as a provisional sum, an allowance that can go up or down.
- Licensed trades. NSW Government says a licence is needed for residential building work valued at more than $5,000 in labour and materials, and for all specialist work, such as electrical wiring, plumbing, drainage and gasfitting, whatever its cost.
- Approvals. Some work needs no planning approval; some needs a certifier or council. More on that below.
Bathroom renovation costs
A bathroom packs a lot of trades into a small room. What moves the price:
- Plumbing and drainage, especially if the shower, toilet or vanity moves. In NSW this is specialist work, so it needs a licensed tradesperson whatever the job’s value.
- Waterproofing, which sits under the tiles, out of sight.
- Tiles, taps and fittings, often listed as prime cost items, so your choices move the final price.
- Electrical work, such as lighting, heating or exhaust fans, which is also specialist work.
- What’s found behind the walls once the old bathroom comes out.
Ask each quote to list the waterproofing, the plumbing and electrical work, the allowance for each fitting, and who the licensed trades are.
Kitchen renovation costs
- Layout. Keeping the sink, cooktop and oven where they are is a smaller job than moving them, which brings in plumbing, gas and electrical work.
- Cabinets and benchtops, which the quote should itemise.
- Appliances, often prime cost items. The allowance in the quote may not match the oven or cooktop you end up choosing.
- Licensed work. Electrical, plumbing and gasfitting are specialist work in NSW.
A new kitchen can change your insurance too. Moneysmart says a new kitchen, deck or extension can increase the rebuild cost of your home, and if you don’t update your policy, your insurance won’t reflect the change.
Granny flat costs
A granny flat is a new, self-contained dwelling on your lot, so its costs look more like a small build than a renovation. What drives them:
- The approval route. NSW Planning says a granny flat can be approved as complying development if it meets the state’s Housing SEPP standards, including a lot of at least 450 m². If it doesn’t, it may still be possible to lodge a development application with your council.
- The design and the site: size, slope, access for machinery, and how far services have to run.
- The building contract. Over $20,000, NSW’s large job contract, progress payment and insurance rules apply (below).
- Connections for water, sewer and power. Ask which ones the quote includes.
For the costs of a build in more detail, see how much it costs to build a house.
Our granny flats in NSW guide covers the approval routes, renting one out and how lenders may treat the rent.
Pool costs
A pool’s price is more than the hole and the shell. The NSW rules add their own costs:
- Approval. NSW Government says to talk to your local council about approval in your area, and that pools over 2,000 litres may also need development approval. It says to use a licensed builder and a principal certifier.
- The barrier. NSW Government says a pool fence must be at least 1.2m high (as measured from the finished ground level), and the fence must not leave a gap at the bottom bigger than 10cm from the finished ground level. Gates should close and latch by themselves.
- Registration. All pool and spa owners must register their pool or spa on the NSW Swimming Pool Register.
- Later on. To sell or rent the home, you’ll generally need a pool certificate of compliance, which is valid for 3 years.
Ask each quote whether the fencing, the approval, the certifier and any landscaping around the pool are included, or sit outside the price.
Got your quotes? We can look at how you’d pay for the work, from your equity, a refinance or a construction loan.
Book My Home Loan ReviewApprovals: what NSW requires
NSW Planning says some minor renovations and low-impact building works don’t need planning approval. It calls this exempt development. To count, the work must meet the exempt development standards in the state’s Codes SEPP, comply with the National Construction Code, and not be on land on the State Heritage Register or under an interim heritage order.
Work that isn’t exempt needs approval: complying development from your council or an accredited certifier when it meets the state standards, or a development application to your council. Which one applies depends on your home and your plans, so ask your council or a certifier ahead of signing anything.
Getting quotes you can compare
The ACT Government’s advice is a useful guide: getting at least three written quotes is a good idea; be specific about fittings, finishes, appliances and floor coverings; and give completed plans if you can. It also says an estimate, even in writing, doesn’t bind the person who gave it, while a quote is a legally enforceable document, and a quote based on an hourly rate plus costs doesn’t set the price. NSW Government warns to be careful of an extremely low quote compared with others.
Ask each tradesperson or builder to put these in writing:
- The full scope of work, room by room.
- Every prime cost item and provisional sum, with its allowance.
- Which licensed trades will do the plumbing, electrical and gas work.
- Whether approvals, certifier fees and waste removal are included.
- The payment schedule and the timeline.
- What’s excluded.
Then check the builder’s or tradesperson’s licence. NSW Government’s online licence check shows the licence holder, its categories and expiry date, and any cancellations or suspensions.
Contracts and payments in NSW
- Over $5,000 (including GST): you need a written contract. From $5,000 to $20,000 it’s a small job contract.
- Over $20,000: a large job contract, with a progress payment schedule, a cooling-off period of five clear business days, and home building compensation cover. No payment of any kind can be asked for until the cover is in place.
- Progress payments must match the work carried out.
- Variations must be in writing, signed by both of you and attached to the contract, with the cost and how it was worked out.
Paying for the work
People pay from savings, redraw or offset, by borrowing through their home loan, or with a personal loan for smaller jobs. Our guide to how to finance a renovation sets out the main ways to pay and how to choose, and our renovation loans page shows how we help with the home loan routes.
How we help
We work on the loan, not the renovation. Once you have quotes, we look at how much equity you may be able to use (our equity calculator gives a first idea) and compare ways to structure the borrowing across lenders on our panel: a top-up, a refinance, a construction loan or a split. Whether one suits you depends on your situation, so we start by asking about it. You decide.
For home loans, you don’t pay us a fee. Lenders pay us a commission if you go ahead with a loan. Lender fees may apply.
Sources: NSW Government, Contracts for residential building work (last updated 29 April 2026), Checking your contractor or tradesperson is qualified, Consumer Building Guide (updated 10 February 2026) and Owning a pool or spa: your obligations (last updated 16 March 2026); NSW Department of Planning, Exempt development (updated 23 October 2026), Secondary dwellings (updated 17 July 2025) and Granny flats (updated 23 March 2026); ACT Government, Costs to consider; Moneysmart, Home underinsurance (last updated 18 August 2026). All read 27 November 2026. Correct as at 27 November 2026. Rules can change.
General information only. It doesn’t consider your objectives, financial situation or needs, and it isn’t tax, legal or financial product advice. Lending criteria, fees and charges apply.

